The 3rd Phase Project


Summary

Incheon Airport’s 3 Phase Construction Project aims to answer to the steadily increasing airline demand of metropolitan areas and reinforce hub competitiveness with neighboring airlines. The currently operated passenger terminal and apron are expected to reach max capacity by sometime around 2017. Accordingly, a total of 5 trillion KRW will be invested from 2009 to 2017 to construct airport infrastructure such as the second passenger terminal, passenger/cargo apron and access/connecting transportation facilities. The completion of the 3 Phase Construction Project will allow Incheon International Airport to support over 72 million passengers and is expected to be a critical milestone in Incheon International Airport’s foray into becoming an airline hub.

Overview

Purpose
Phase-by-phase expansion in order to readily prepare for growing aviation demand, and to become
a regional hub amidst competition
Period
2009 ~ 2017 (9 YRS)
Cost
4.9 bil. USD

Contents

Integral system which can share information among company, supervision and contractor is established to control systematic and transparent project management. In addition, advanced project management is executed with process/construction cost integral control and BIM(3-dimensional design review system) which is introduced for the first time in domestic airport construction project. Furthermore, Expert pool which consists of Phase 1 & 2 experienced engineers and experts is established to reflect accumulated experience and know-how to the 3rd Phase Construction Project.

Contents
Classification Phase 1 & 2 Phase 3 Remark
Passenger Terminal T1↔Concourse A(54 mil.) T2 (18 mil.) 72 mil.
Cargo Terminal 4.5 mil. ton 0.5 mil. ton 5.0 mil. ton
Passenger Apron 108 56 164
IAT(Shuttle Train) 0.9km Double Track Shuttle 1.5km Double Track Shuttle  
BHS 88km 42km  
Landside Landside Seoul Station↔T1(61km) T1↔T2(6.4km) Double Track 67.4km
Access Road 8 Lanes 8 Lanes  
Connecting Road - T1 ↔ T2(4 Lanes)  

Project Management Schedule

Establishment and Operation of Integral Project Management System
Establishment and Operation of Integral Project Management System
Core Item System Main Exertion
Efficiency PMIS(Integral Project Management System) - Efficient control of the 3rd Phase Project and application to future overseas project
Enhancement BIM(3 Dimensional Design Tool) - Review of design interference, human movements, landscape and process
Advancement EVMS(Integral Control of Process/Construction Cost) - Control system advancement through systematization of process and project cost control
Engineering Coordination and Quality Control System
Engineering Coordination and Quality Control System
Core Item System Main Exertion
Coordination Interface consultative group - Constitution of interface exclusive organization(Airport Corporation, Project Management Contractor, Design Contractor)
Specialization Interface consultative group - Operating airport construction expert pool consists of 120 persons * Including phase 1 & 2 experienced expert(14 persons)
Systematization ISO9001 KOSHA18001 - Construction quality control by quality management system
(Internal and external review, ISO 9001)
- Construction disaster prevention at site , establishment of safety and health management system
- Revision of code and project management procedure(quality, design, construction, process)

Characteristics

The 3rd phase construction is truly meaningful in that Incheon Airport joins the ranks of large-sized airports, with processing capacity of 50m int'l pax. Larger airports tend to have connection problems due to the distribution of terminals. In order to solve this problem, the transportation system will be placed in one building, to improve the ease of transfer by transfer cluster, and to simplify the moving system.

Convenient Transport
Public
Transportation
  • Minimize outdoor exposure
  • Provide integrating public transportations such as bus, railway, and short-term parking lot
  • Especially, close placement for train station(59m)
Connectivity
between Terminals
  • Travelling within the shortest time between terminals(railroad, connecting road)
Transfer Cluster
  • Enhance convenience by directly connecting transit and transit facilities
Differentiated Images
Eco-friendly and
Smart Airport
  • Eco-friendly airport with landscaping space
  • Introduction of state-of-the-art ICT techology
Energy saving
Airport
  • Apply solar system, geothermal, natural light (40% Energy savings)
Culture Airport
  • Featuring a traditional Korean culture
 


비행기