Phase 4 Construction Projects
The era of 100 million passengers has begun.
Incheon International Airport now has the capacity to accommodate 106 million passengers and handle 6.3 million tons of cargo annually, thanks to the construction of a fourth runway and the expansion of the second passenger terminal, which were completed over a seven-year, four-phase construction project. With this framework established, we will adapt to shifts in the airport industry paradigm, enhance our future competitive advantage, and advance into the “Incheon Airport 4.0” era to create new value.
-
Number of flights Approx. 100,000 flights -
Air Cargo 1.3million tons -
Passenger Capacity 29million annually
Phase 4 Construction History
- Departure, Transfer: 11,150 bags/hr
- Arrival: 28,800 bags/hr
Phase 4 Construction OverView
| Period | 2017.11.~2024.10.(84months) |
|---|---|
| Scale |
Terminal 2 347,000 ㎡ 1 Runway 62 Passenger Aprons, 13 Cargo Aprons |
| Project Cost | KRW 4.8 trillion |
| Major Milestones |
Nov. 13, 2017 Public Notice of an Amendment to the Basic Plan for Incheon International Airport Construction (4th Phase) Nov 01, 2018 Commencement of the construction for the fourth runway Nov. 01, 2019 Commencement of the expansion construction for terminal 2 |
| Flight Processing Capacity | Capable of Handling Over 1,000 Flights Daily Per Annum |
| Cargo Handling Capacity | 600,000 Flight Operations |
| Cargo Handling Capacity | 6.3 million tons |
| Passenger Handling Capacity | 106 Million |
Photo Gallery
- writing date 2020.01.03
- hits 172
Terminal 2, which was the key facility of the phase 3 construction, was built in the northern area of the airport for separate operation. The feasibility of the facility’s location was evaluated through countless reviews and discussions as well as expert consultation from International Civil Aviation Organization (ICAO) and Federal Aviation Administration (FAA) in order to proceed with the project.
Terminal 2 has a total floor area of 387,000m2 (38.7 ha), which is about 77% of that of Terminal 1, and has two underground and five above-ground floors. Improvements and reinforcement were made on the issues of the existing terminal to build a more convenient and pleasant high-tech terminal. The terminal constructed to the scale of 460m (0.3 mile) in length and 880m (0.6 mile) in width, using 323,000m2 (32.3 ha) of concrete, 72,000 tons of steel frame, and 12,000 units of precast concrete.
The terminal was designed to form the shape of a phoenix upon completion of the phase 4 construction and embodies Incheon International Airport’s brand identity that combines Korea’s traditional culture and its modern creative culture through the concepts of green airport (airport that breathes with nature), eco airport (sustainable and eco-friendly airport), and smart airport (airport made safer and more convenient through advanced technology).
With completion of Terminal 2 which has an annual passenger capacity of 18 mil., Incheon International Airport took its first step as a mega-size airport that can accommodate 72 mil PAX annually.